Bridge Barrier Fabrication, Repairs & Coatings
CLIENT: SUNSHINE COAST REGIONAL COUNCIL
Bridges Coatings Completed:
- Mooloolah Island Bridge​ (July 2017)
- Loch Lamerough Parade Bridge (August 2017)
- Bundilla Bridge (November 2019)
Bridge Steel Fabrication Completed:
- Henzell Bridge (March 2020)
- Chevallum Road Bridge (March 2020)
WORK SCOPE (Coatings):​​
-
Removal of steel barriers from bridge & transport to Nabis workshop;
-
Repair work to steel substrate;
-
Preparation of substrate by means of abrasive blasting;
-
Application of a three-layer coating system;
-
Transport back to bridge & Reinstall;
​
WORK SCOPE (Fabrication of New Barriers):​​
-
Develop shop drawings;
-
Fabricate steel barriers at Nabis workshop;
-
Fabricated barriers galvanised;
-
Newly galvanised barriers installed onto the bridge with traffic control in place;
-
If sought after, Nabis also provides a coating process to coat over the galvanising for additional protection and aesthetic purposes.