top of page
20190916_120614.jpg

Bridge Barrier Fabrication, Repairs & Coatings

 

CLIENT: SUNSHINE COAST REGIONAL COUNCIL

Bridges Coatings Completed: 

                                        - Mooloolah Island Bridge​ (July 2017)

                                        - Loch Lamerough Parade Bridge (August 2017)

                                        - Bundilla Bridge (November 2019)

Bridge Steel Fabrication Completed:

                                       - Henzell Bridge (March 2020)

                                       - Chevallum Road Bridge (March 2020)

WORK SCOPE (Coatings):​​

  • Removal of steel barriers from bridge & transport to Nabis workshop;

  • Repair work to steel substrate;

  • Preparation of substrate by means of abrasive blasting;

  • Application of a three-layer coating system;

  • Transport back to bridge & Reinstall;

 

 

20170810_072749
20170810_072840
20170628_131745
20170608_121940
20170616_154522
20170816_072848
IMAG0398

​

WORK SCOPE (Fabrication of New Barriers):​​

  • Develop shop drawings;

  • Fabricate steel barriers at Nabis workshop;

  • Fabricated barriers galvanised;

  • Newly galvanised barriers installed onto the bridge with traffic control in place;

  • If sought after, Nabis also provides a coating process to coat over the galvanising for additional protection and aesthetic purposes.

 

 

Photo 6-3-20, 1 38 23 pm
20190916_120614
20200303_070110
20200303_070317
IMAG0621
Photo 10-3-20, 2 03 50 pm
bottom of page