Innisfail Harbour Pile Rehabilitation

CLIENT: Cassowary Coast Regional Council

DATE OF COMPLETION: August 2019

EQUIPMENT:

WORK SCOPE:

 - The fabrication of 20 mooring piles and walkway brackets at the Nabis Fabrication Yard

 - Sand Blasting and Coating of the Piles using a Marine Epoxy

 - Transportation of piles and marine-based machinery to Innisfail from the Sunshine Coast

 - Removal of the existing pile paraphernalia and walkways

 - Alterations, refabrication, and Hot Dip Galvanising of existing walkways

 - Sleeving old 406 dia mooring piles with newly fabricated 508 dia using Nabis Piling Barge

 - Grouting the annulus between the existing mooring piles and the newly fabricated sleeves

​

 

 

 

​

​

​

​

​

​

​

​

Alternative initiative conducted by Nabis:

 - The prescribed timber fenders were superseded by the use of a combination of Wagner's CFT and recycled plastic as the external rubbing strips. This option provided an enhanced design life and a long term cost-effective solution. 

​

 

 