top of page

MBRC Footbridges

CLIENT: MBRC

DATE OF COMPLETION: March 2022

WORK SCOPE:

Multiple footbridges constructed for the MBRC ranging from 9m to 11m.

The existing structures were dismantled and removed from the site.

All bridges followed a similar design. 

Photo 17-2-22, 9 12 51 am
Photo 17-2-22, 1 25 40 pm
IMG_20220302_081412
IMG_20220222_071722
Picture1
Photo 17-2-22, 10 19 09 am
IMAG3505
bottom of page