top of page

McLoughlins Beach Footbridge and Pontoons
CLIENT: Wellington Shire Council
DATE OF COMPLETION: February 2016
EQUIPMENT: -
- Trolley Based Piling Rig
WORK SCOPE:
-
Design & Construction of a 180m long Foot Bridge to Mcloughlin's Beach;
- Nabis proposed the use of CFT as an alternative tender submission and consequently, won the contract. -
Design, Piling, & Install of two floating pontoons adjacent to the footbridge;
-
Demolition of the existing 180m long timber bridge.
​
​
​
​
​
​
​
​
​
​
​
​
​
​
![]() | ![]() | ![]() |
---|---|---|
![]() | ![]() | ![]() |
![]() | ![]() |
bottom of page