Urangan Harbour MSQ Base of Operations Pontoon

 

CLIENT: Marine Safety Queensland & The Department of Transport and Main roads

DATE OF COMPLETION: December 2018

EQUIPMENT: 

WORK SCOPE:

  • Dredging of the site by barge and excavator with the spoil trucked and disposed of off-site;

  • Remediation and repair work to the existing southern pontoon;

  • Supply of a marine Palfinger Crane for the installation by MSQ at a later date;

  • Demolition and removal of existing northern pontoon and piles;

  • Design, supply, and installation of a 12 x 3.0m TMR spec pontoon; 

  • Installation of 2 x 457 Dia steel piles into sandstone;

 

 